Motor-Pump alignment is the process of aligning shaft centerlines between a motor and a pump. The motor is the prime mover, transferring power to the pump by the use of a coupling. This is probably the most common configuration of coupled machines in industry.
In this type of alignment, the motor is almost always the moveable machine, and the pump is the stationary machine. In almost all cases, the pump is already piped up with suction and discharge flanges, which means it can move only slightly, if at all.
motor-pump-alignmentProper shaft alignment is achieved by moving the motor. The motor is shimmed vertically to achieve the proper elevation to align it to the pump, both parallel (offset) and angular. The motor is them moved horizontally to achieve proper horizontal placement for aligning the shaft centerlines, both parallel and angular. The motor is moved horizontally by the use of jacking bolts, or by the use of pry bars, hammers, or other tools.
Motors are normally easier to move, since the motor is not piped into a process system. A short run of flexible conduit is most often used to run the electrical wiring from a local disconnect, or a rigid conduit, to the motor termination box. This allows for ease of movement of the motor.

Materi
1. Fundamental Alignment
2. Diagnosing Misalignment
3. Measuring Misalignment
4. Preparing Task Alignment
5. Alignment Methods (praktis)
•Rough Methods
•Face and Rim
6. Alignment Tolerances
7. Complicating Factor Alignment.
8. Introduction to Laser Alignment
9. Minimizes the forces of misalignment acting upon the bearings and seals of both components.
10. Minimizes Wear of The Coupling.
11. Reduce Energy Costs.
12. Maximizes the life of the Machine Components by Minimizing Wear, ncreasing time between failures, and reducing vibration.

Method
•Presentation
•Discussion
•Simulation
•Case Study
•Evaluation

Who Should Attend
Instrument Engineer/Supervisor, Plant Maintenance/Operators/Supervisors

Instructor
Mokhamad Munir Fahmi, Ir, MT. And Tim
(CV Terlampir)

Time & Venue
TANGGAL  : 27 sd 29 September 2016
WAKTU      : 08.00 – 16.00
TEMPAT     : Hotel Grand Aston Yogyakarta

Facilities
1.Convinience Meeting room
2.Souvenir
3.Certified
4.Transportation during training
5.2x coffee break and lunch during training
6.Training kit

Registration Contact
Egga
WA : 081343582804
Email : eggatraining@gmail.com

CG

Leave a Reply

Your email address will not be published. Required fields are marked *